Long lead times and soft costs, fueled by the world-leading US wages for "white collar" work, are the root cause of poor performance in low-volume production because there are few units to spread the soft costs over.
Austin Vernon
Everything, newest first — across every channel. Their profile →
Hiding
12 February
5 July 2025
23 December 2024
18 April 2024
From one piece How to Make Off Grid Data Centers Affordable 9 beliefs, in the piece's order there
-
Their words
Efforts to improve efficiency and remove vestigial features pay off handsomely.
How to Make Off Grid Data Centers Affordableaustinvernon.site
-
Their words
Some efforts, like nuclear-powered data centers, are reminiscent of Toyota's hydrogen push.
How to Make Off Grid Data Centers Affordableaustinvernon.site
-
Their words
The 100-megawatt facility might have ten 10-megawatt blocks served directly by a 1500V DC feeder line without connections to other blocks that would require extra switches and routing.
How to Make Off Grid Data Centers Affordableaustinvernon.site
+ 6 more
-
Their words
The cooling systems in most data centers are energy hogs and contribute no direct value.
How to Make Off Grid Data Centers Affordableaustinvernon.site
-
Their words
Deleting the UPSs could knock off ~$750/kW after considering equipment, installation, and square footage reduction.
How to Make Off Grid Data Centers Affordableaustinvernon.site
-
Their words
Installed generators cost ~$800/kW, and the data center capital cost, including servers, is ~$40,000/kW, so adding 1% more makeup compute capacity is money ahead of purchasing generators.
How to Make Off Grid Data Centers Affordableaustinvernon.site
-
Their words
The optimal scenario is typically when the generators supply 1% of yearly electricity (shown below).
How to Make Off Grid Data Centers Affordableaustinvernon.site
-
korrents.com
A data centre powered by solar and batteries alone needs an array so oversized that the design is not worth building.Their words
The solar array sizes under these assumptions are prohibitively large.
How to Make Off Grid Data Centers Affordableaustinvernon.site
-
korrents.com
Air cooling has run out of headroom for AI racks, so liquid cooling is now a requirement rather than an upgrade.Their words
AI servers bring new challenges because many require liquid cooling.
How to Make Off Grid Data Centers Affordableaustinvernon.site
Nothing matches.
What is a korrent?
A korrent is a belief a person has stated in their own words: one sentence stating the claim, backed by a quote and a source, kept at korrents.com.
Under a name here, the quoted block is what they actually said. The korrent beneath it is the claim those words support, in korrents' wording — tap it to see the record, its source, and who else holds it.
Nobody here wrote their own korrents. They are compiled from public statements, and a person can change their mind, which is recorded too.
About the English under a post
Some people here publish in a language other than English. Where they do, this site shows a machine translation beneath the post, in this typeface — the site's own, not theirs.
The post itself is never changed, moved or hidden: what is set in the serif above is exactly what the person published, and it is what to quote them on. A translation can be wrong in ways that matter, especially about tone.
Only the post's own words are translated. A quoted post, a linked article and a belief on korrents.com are left in their original language.